Search
Close this search box.

RE 500P & RW 500 Applied on Hot Car Structure

Hot car structure during fabrication RE 500P applied at 100um nominal RW 500 applied at 350m to 20mt long frame Carefully loading the finished frame OVERVIEW:    The project consisted of a long wall approximately 20 mt long and 2 side walls approximately 4 metres long each. This was an excellent opportunity for Chemcote to provide […]