Long Term Protection Of ISOtainers
Newly fabricated tank internals Tank Internals Confined space entry Completed tanks for delivery to customer OVERVIEW: The asset owner approached us to provide protection for their for their new investment, 304 Stainless Steel tanks which would contain 13-15% Sodium Hypochlorite INDUSTRY Chemical Production ENVIRONMENT 13-15% Sodium Hypochlorite SUBSTRATE New 304 Stainless Steel CHALLENGE Asset […]
Floating Restaurant Structure Repairs Using Underwater Curing Epoxies
Condition before surface preparation Mechanical Preparation Primer Application Second Coat applied OVERVIEW: In the complete refurbishment of the underside of this floating structure, some areas were replaced. Other areas required repairs to be done in-situ by using underwater curing epoxies. A team of experienced divers applied the underwater curing Epo chem™ system, which is […]
Relining of Open Top Quench Tank
Condition before abrasive blasting Containment set up to prevent dust emissions Removal of garnet after abrasive blasting First Coat Spray applied OVERVIEW: Chemcote’s specialist team has achieved excellent corrosion protection for their customer. By using Chem-tect™ RB 300 the Open Top Quench Tank is expected to surpass a further 20 years life in service. […]
Chemical Storage Tank Relining
Site set up Condition upon inspection After Blasting Coating Complete OVERVIEW: When you’re storing harsh chemicals like sulphonic acid, unfortunately deterioration, staining, and corrosion are inevitable. That’s why relining storage tanks with high-performance anti-corrosion products is so important. INDUSTRY Chemical ENVIRONMENT Sulphonic Acid Storage at 50°C SUBSTRATE Chemical Storage Tank – Mild Steel, with […]
Refurbishment of J Strainer using Vinyl Ester – RB 300
Needle Gunning to minimise Abrasive Blasting Costs First coat applied after abrasive blasting Pitfilling to ensure coating continuity Reassembly on site OVERVIEW: Illustrated a sound understanding of the results required to refurbish and extend the life of heavily corroded equipment. Proven performance after 20 years of using “Chemco International” coatings.Chemcote has provided long term […]
Sulphuric Acid Plant Concrete Slab Repairs
Deteriorated concrete beneath fibreglass lining Jack hammer used to remove debris Core drilling samples taken to assess extent of concrete damage Completed with anti slip OVERVIEW: Sulphuric Acid caused deterioration of the existing fiberglass matting. The failure of the previous fiberglass lining had enabled permeation, allowing serious corrosion of the concrete slab. The Chem-tect™ system […]
Blast Furnace Dust Discharge Valve Refurbishment
On arrival suffering corrosion erosion Condition on arrival Refurbishment process After coating internals OVERVIEW: Environments such as blast furnaces are subject to high temperatures and particulate, which can accelerate the onset of corrosion and erosion. Constant exposure to heat and blast furnace dust over a period time has a damaging impact on steel structures, […]
Column Pump Composite Repairs
Strip and assess on site Reinforcing diffuser leading edges After First Coat Detailing flange faces of impeller casing (Intermediate) Column Externals OVERVIEW: Chemcote were approached to improve corrosion resistance and improve fluid flow efficiency for this Power Generation Customer’s cast iron column pump INDUSTRY Power Generation ENVIRONMENT Ambient Salt Water SUBSTRATE Cast Iron Column […]
Extension Leveller Cassette Corrosion Prevention
Condition in Situ After Blasting Inspection in Workshop Coating Application on Site OVERVIEW: Since re-coating Chemcote’s team has ensured the Extension Leveller is now in excellent condition and maintenance costs have also been drastically reduced. INDUSTRY Steel Manufacturing ENVIRONMENT Recycled cooling water SUBSTRATE Steel CHALLENGE Asset owners of the Extension Leveller Cassette engaged us to […]
Emergency Condenser Water Box Repairs
Damaged Area On Arrival After Reinforcing with composite mat using Rs500P External Composite Repair OVERVIEW: Continuous repairs were required after relining in 2015 using a ceramic filled epoxy was found to have localised failures within 3 months of installation. All repairs carried out by Chemcote have been found to be in excellent condition INDUSTRY […]