Mooring Dolphin Access Walkway Life Extension
Overview: The walkway was reaching the end of its service life, and the asset owner was looking for a medium-term life extension with minimal disruption
View over 100 detailed case studies by industry.
Overview: The walkway was reaching the end of its service life, and the asset owner was looking for a medium-term life extension with minimal disruption
Condition of surface before mechanical preparation RB 364 applied to spot abrasive blasted surfaces Pugmill externals Coating with InD Cote Previous Next OVERVIEW: A
Repairs required Application of Primer Coating applied to affected areas After application of Topcoat Previous Next OVERVIEW: A 40 year old excess gas bleeder structure
Overview: The walkway was reaching the end of its service life, and the asset owner was looking for a medium-term life extension with minimal disruption
Condition of surface before mechanical preparation RB 364 applied to spot abrasive blasted surfaces Pugmill externals Coating with InD Cote Previous Next OVERVIEW: A
Overview: The walkway was reaching the end of its service life, and the asset owner was looking for a medium-term life extension with minimal disruption