Refurbish Fibreglass Tanker

12,000 litre rigid tank Underside of outlet Faulty join between the elbow and pipe section, showing void New outlet installed and tank hydrostatically tested OVERVIEW:    Chemcote was able to successfully refurbish this asset owner’s 5 year old FRP tanker to protect against Sodium Hypochlorite. The surface was treated to neutralise the pH and composite […]

Chem-tect™ 300 Series for Self Cleaning Strainer

Externals on arrival Degree of pitting after repetitive hot wash and abrasive blasting Internals near completion, build up shaft lands Back Wash Cover assembly OVERVIEW:    Our client’s strainer has been in service for 30 years. Upon inspection of the strainer body, back wash covers & critical dimensions found the substrate to be severely corroded, […]

Epo-chem™ 500 Series for Pump & Base

Pump with factory shop primer Completed coated pump Application of final coat Complete coating of pump, coupling guard, channel base frame and two pole motor OVERVIEW:    Steel multi-stage pump assemblies in an 80°C corrosive aqueous ammonia environment required long term protection. The external coating system was required to act as a corrosion barrier for […]