OVERVIEW: A customer was looking for a longer term solution to a corrosion erosion issue. Glass flake filled coatings provide excellent insulating properties against corrosion and the ceramic filled epoxy provides exceptional protection against erosion. The customer has found the pump now functions more efficiently when in use consuming less power allowing a payback period of the entire refurbishment to be only 14 months.
INDUSTRY
ENVIRONMENT
Dam Water
SUBSTRATE
Cast iron body
CHALLENGE
The client’s pump had dropped off in efficiency. This was due to the combination of corrosion and mechanical fatigue. The client was looking to improve efficiency and reduce power consumption.
SOLUTION
After 25+ years in service the substrate was heavily contaminated with metallic salts. This required heat treatment and a number of abrasive blasts to reduce salts below 25ppm. We then recommended the application of 2 coats of RB 332; a glass flake filled vinyl ester providing an excellent corrosion barrier and long term protection. We then applied 2 coats of RB 300GL to enhance fluid efficiency in turn reducing power consumption.
SCOPE
Strip and assess
Manufacture template to ensure mating faces match
Grind rebates on all flanged faces, allowing the coating to be applied on the flange face preventing future crevice corrosion
Protect critical dimensions
Abrasive blast and treat to reduce metallic salts by hot washing and re-abrasive blast
Apply corrosion barrier RB 332
QA included spark testing
Rebuild gland packing areas
Apply top coat of RB 300GL
PRODUCTS
OUTCOME
Pump repairs were achieved and by coating with RB 300, future corrosion is prevented with a reduced amount of friction through composite technology. The pump now functions more efficiently when in use and consumes less power, which led to carbon credits and greenhouse gas reduction. The payback period of the entire refurbishment worked out to be only 14 months.
RELATED CASE STUDIES
Refurbishment of Basket Strainer
After fabrication repairs After abrasive blasting, pitting visible Finished 300 Series Vinyl Ester Internals nearing completion OVERVIEW: Customer required long term corrosion protection for
Duo Chek Valve
Masking and ready for abrasive blasting Application of multiple coats of RB364 internally Holiday testing to ensure coating continuity Coating complete OVERVIEW: Chemcote was
Pipe External Corrosion Protection
Existing corrosion, mech prep after UHPWB Application of spot primer Mid coat applied to affected areas After application of topcoat OVERVIEW: Chemcote was engaged