Search
Close this search box.

Mining & Mineral Processing Case Studies

Preventing Stress Corrosion Pitting

Site Layout before equipment setup Previously applied coatings delaminated Ammonia Absorber Circulation Tank OVERVIEW:    The 304 stainless steel ammonia absorber and circulation tank experience

Read More »

Hot Air Impeller

Pre balanced coated fan RU 500 Low friction finish Completed coated and balanced fan using RS 500P & RU 500 OVERVIEW:    The fabricated carbon

Read More »

Ventilation Fan

During Fabrication Application of primer by hand due to complexity View of fan on completion OVERVIEW:    The fan required pressure washing every 3-6 months

Read More »
Contact us for Long Lasting Protective Coatings in Australasia