OVERVIEW: There’s no doubting the power of mother nature. Seawater is a naturally corrosive substance that is problematic when you want to protect your valuable plant assets. When you’re operating in an immersed environment, the right choice of protective coating will help maximise the life of your equipment and protect it from corrosion for longer.
INDUSTRY
ENVIRONMENT
15°C – 60°C sea water
SUBSTRATE
Critical support structure for 40 year old overhead pipe services into turbine hall
CHALLENGE
The original environment was considered atmospheric. However, due to regular leaking valves and flanges, the protective coating specification required reclassification to immersed after the original paint system failed.
Difficult access and an ageing asset were key factors in the assessment process. Additionally, abrasive blasting was not possible as the containment and clean-up costs were prohibitive.
SOLUTION
Following site mobilisation, and mechanical cleaning of difficult to reach areas, the substrate was given an ultra-high-pressure water blasting of up to 20,000 psi using a small footprint machine.
The team carried out soluble salt tests to ensure the levels were within coating parameters. Next steps involved applying Epo-chem™ RL 500P to a nominal thickness of 100µm, and then a top coat using Epo-chem™ RA 500 with a nominal DFT of 350µm.
Gaps between the pipe saddles and pipe itself were sealed to give the structure extra protection against moisture and air.
SCOPE
Mobilise to site
Mechanically clean hard to reach spaces
Ultra-high-pressure water blast up to 20,000 psi using small footprint machine
Soluble salt tests conducted to ensure levels are within coating parameters
Apply Epo-chem™ RS 500P to a nominal thickness of 100µm
Apply Epo-chem™ RA 500M top coat with a nominal DFT of 350µm
PRODUCTS
Epo-chem™ RS 500P primer – a wet and surface tolerant mio epoxy primer
Epo-chem™ RA 500M series, a moisture tolerant glass flake filled epoxy top coat, providing excellent long term corrosion resistance
OUTCOME
Water blasting combined with the mix of a moisture tolerant epoxy primer and a glassflake filled epoxy top coat proved the perfect formula for long-term corrosion resistance. The customer also saved thousands in replacement costs, enabling the power station to continue operating at peak productivity without concerns of future corrosion.
RELATED CASE STUDIES
Blast Furnace Recovery Turbine Repairs
Set up of Containment Masking before Blasting Spool Condition before Coating Aerial view of Outlet Spool from Shutoff Valve Completed Outlet Spool Internals Application of
Long Term Protection Of ISOtainers
Newly fabricated tank internals Tank Internals Confined space entry Completed tanks for delivery to customer OVERVIEW: The asset owner approached us to provide protection
Floating Restaurant Structure Repairs Using Underwater Curing Epoxies
Condition before surface preparation Mechanical Preparation Primer Application Second Coat applied OVERVIEW: In the complete refurbishment of the underside of this floating structure, some