OVERVIEW: The Leading Steel Manufacturer had a preheater in service for a number of years with previously applied coating failing due to poor coating selection and surface preparation and was after a coating to extend service life.  

Work had to be completed during a short shutdown duration with only 60 hours allocated for coating application. 

ENVIRONMENT

Coke Ovens Gas and residue

SUBSTRATE

Mild steel substrate

CHALLENGE

Leading steel manufacturer has a preheater in service for a number of years with previously applied coating failing due to poor coating selection and surface preparation. Weld repairs to shell plate were carried out 4 years prior due to the corrosion allowance exceeding parameters.

Engineer was after a coating to extend service life. Work had to be completed during a short shutdown duration with only 60 hours allocated for coating application. Arrangements were made overnight to mobilise the site first thing the following morning.

SOLUTION

We recommended RB 332, glassflake filled vinyl ester, for its quick cure time, low moisture vapour transmission rate, and excellent corrosion and electrical isolation protection in wet environments. This coating system provides excellent corrosion/erosion resistance.

SCOPE

Abrasive blasting to remove dense residue

Potassium Ferrous Cyanide to determine surface cleanliness

Grinding and weld repairs to perforations 1st coat of RB 332 hand applied

DFT checks done after first coat and pit filling Top coat applied

OUTCOME

As a result of the fast cure and good project management, the preheater was back into service on time despite various delays. Coating was completed to client’s expectations and future scheduled inspections will ensure long term protection.

RELATED CASE STUDIES

Fast Curing Abrasion Protection

Condition of surface before mechanical preparation RB 364 applied to spot abrasive blasted surfaces Pugmill externals Coating with InD Cote OVERVIEW:    Chemcote’s specialist team

Read More »

Composite Pipe Repair

Flange is barely attached Repairs commence Repairs using composite weave mat Coating complete OVERVIEW:    A power station client required corrosion protection for a 30-plus

Read More »
Contact Our Specialist Coating Advisors