OVERVIEW: Engineers had tried and tested many different coatings with varied results for this Hot Coking Coal Quenching Structure.
Major structural steel repairs were carried out every two years due to the aggressive nature of this environment.
INDUSTRY
ENVIRONMENT
1,000°C Coking Coal transport wagon and moved to the quenching station, where 80°C recirculated water is used
SUBSTRATE
Mild steel substrate
CHALLENGE
Major structural steel repairs are carried out every two years due to the aggressive nature of this environment, the regular thermo cycling in service exceeds many coatings limitations. Oven temperature Coke is pushed in the Hot Car wagon where all of the coated surfaces are protected with sacrificial wear plates acting as heat shields where it is transported to the quenching area and an estimated 80 tonnes of recirculated water is dumped onto the Hot Coking Coal.
Engineers have tried and tested many different coatings with varied results. Main challenges are most of the work is carried out on site where abrasive blasting is not always possible due to the tight time schedule whilst other trades are working alongside the Chemcote Applications Team.
SOLUTION
We recommended Epo-chem™ RE 500P a high temperature resistant surface tolerant, Novolac Epoxy primer. Top coated with Epo-chem™ RW 500, glassflake filled, high temperature resistant Novolac Epoxy. The coating system provides excellent corrosion/erosion resistance against this environment.
SCOPE
Abrasive blasting to AS 1627.4 Class 3, 60µm profile on new sections in our workshop
All areas on site were mechanically cleaned using a scabbler, needle gun and bristle blaster to thoroughly remove all signs of corrosion. Application of RE 500P in one coat at 100µm nominal and application of RW 500 at 350µm Dry Film Thickness (DFT)
PRODUCTS
OUTCOME
Most linings were failing within a short period of time, between 2 & 8 weeks of service. An inspection of Chemco International’s high temperature coating systems after 2 weeks has indicated the lining is in excellent condition
RELATED CASE STUDIES
Mooring Dolphin Access Walkway Life Extension
Overview: The walkway was reaching the end of its service life, and the asset owner was looking for a medium-term life extension with minimal disruption
Preventing blockages using Chemcote Solution
Condition of surface before mechanical preparation RB 364 applied to spot abrasive blasted surfaces Pugmill externals Coating with InD Cote Previous Next OVERVIEW: A
Base Plate Corrosion Prevention
Repairs required Application of Primer Coating applied to affected areas After application of Topcoat Previous Next OVERVIEW: A 40 year old excess gas bleeder structure