OVERVIEW: The project consisted of a long wall approximately 20 mt long and 2 side walls approximately 4 metres long each. This was an excellent opportunity for Chemcote to provide ultimate surface preparation and application.
Most linings were breaking down and failing within a short period of time, between 2 & 8 weeks of service.
INDUSTRY
ENVIRONMENT
1,000°C Coking Coal transport wagon where 80°C recirculated water is used to quench the load.
SUBSTRATE
Steel outlet and inlet spools, flange faces, shut off valves, turbine casing components and manway covers
CHALLENGE
After successful spot repairs on existing hot car structures insitu, we were asked to provide the same solution on a brand new fabrication. The challenge was the length and weight of the items and the attention to detail required around all the crevices and welds.
SOLUTION
We recommended Epo-chem™ RE 500P a high temperature resistant surface tolerant, Novolac Epoxy primer. Top coated with Epo-chem™ RW500, glassflake filled, high temperature resistant Novolac Epoxy. The coating system provides excellent corrosion/erosion resistance against this environment.
SCOPE
Abrasive blasting to AS 1627.4 Class 3, 60µm profile.
Application of RE 500P in one coat at 100µm nominal and application of RW 500 at 350µm Dry Film Thickness (DFT)
OUTCOME
An inspection of our spot repairs after 12 months have indicated that our glass flake coating system can withstand these harsh environments. We expect the freshly coated components to provide the most superior coating system used on this structure to date. This saves the client a lot of money and reduces a lot of equipment down time.
RELATED CASE STUDIES
Refurbishment of Basket Strainer
Strainer nearing completion Internals nearing completion Internals illustrating pit filling After abrasive blasting, pitting After fabrication repairs OVERVIEW: Chemcote provided a long term corrosion protection for
Mooring Dolphin Access Walkway Life Extension
Installation of Access System Environment and safety are always Chemcote’ s No 1 priority. One of many supports requiring weld repair. Walkway refurbished and ready
Preventing blockages using Chemcote Solution
After initial clean Extensive repairs required Application of Glassflake Ceramic system Basalt Fibre Application on externals OVERVIEW: Chemcote was engaged to repair and protect a